Real-time Energy and Solar Monitoring and Reporting
Port Coogee Village Shopping Centre
PAE are engaged to verify the performance and report on a 50kW solar system installed at Port Coogee Shopping Centre and account for billing purposes solar energy consumed to ensure asset performance and the return on investment target is being achieved.
Outcomes
- Asset Performance verification and cost recovery